MEP Data Center Construction Delivery Project Manager

Oracle

USA Posted 2 days ago

$109,200 - $223,400/year

Role Details

View More Jobs

.component-styling-wrapper-108043 .job-details__title { color: rgb(29, 28, 27);
font-family: 'Oracle Sans', Arial, sans-serif;
text-align: center; } @media all and (min-width: 768px) { .component-styling-wrapper-108043 .job-details__title { font-size: 36px;
line-height: 1 } }

MEP Data Center Construction Delivery Project Manager

.component-styling-wrapper-108037 .job-details__subtitle { color: rgb(29, 28, 27); }

MI, United States
United States

.component-styling-wrapper-108027 .job-meta__title { color: rgb(29, 28, 27);
font-family: 'Oracle Sans Semi Bold', Arial, sans-serif; }
.component-styling-wrapper-108027 .job-meta__subitem { color: rgb(29, 28, 27);
font-family: 'Oracle Sans', Arial, sans-serif; }
.component-styling-wrapper-108027 .job-details__section { background-color: rgb(244, 244, 244);
border-color: rgb(62, 127, 124);
border-radius: 4px;
border-width: 1px; border-style: solid; }
.component-styling-wrapper-108027 .job-details__section .job-meta__pin-icon { color: rgb(49, 45, 42); }

  • Job Identification
    325767
  • Job Category
    Product and Research
  • Posting Date
    03/10/2026, 03:22 PM
  • Role
    Individual Contributor
  • Job Type
    Regular Employee
  • Does this position require a security clearance?
    No
  • Years
    3 to 5+ years
  • Additional Info
    Visa / work permit sponsorship is not available for this position
  • Applicants are required to read, write, and speak the following languages
    English

.component-styling-wrapper-108030 .job-details__description-header { color: rgb(29, 28, 27);
font-family: 'Oracle Sans Bold', Arial, sans-serif;
text-align: left; } @media all and (min-width: 768px) { .component-styling-wrapper-108030 .job-details__description-header { font-size: 20px; } }
.component-styling-wrapper-108030 .job-details__description-content { color: rgb(29, 28, 27);
font-family: 'Oracle Sans', Arial, sans-serif; } @media all and (min-width: 768px) { .component-styling-wrapper-108030 .job-details__description-content { line-height: 1.5 } }

Job Description

The MEP Data Center Construction Delivery Project Manager leads the onsite oversight and execution of complex mechanical, electrical, and plumbing (MEP) activities for Oracle’s major data center projects. Acting as a technical and project delivery expert, this role coordinates closely with developers, contractors, and internal partners to ensure MEP construction meets all design, quality, safety, schedule, and budget objectives. The successful candidate will drive contractor accountability, risk mitigation, and best practices in MEP systems, playing a critical role in delivering world-class data center infrastructure to support Oracle’s rapid growth. Position is onsite in Saline, Michigan.

.component-styling-wrapper-108031 .job-details__description-header { color: rgb(29, 28, 27);
font-family: 'Oracle Sans Bold', Arial, sans-serif;
text-align: left; } @media all and (min-width: 768px) { .component-styling-wrapper-108031 .job-details__description-header { font-size: 20px; } }
.component-styling-wrapper-108031 .job-details__description-content { color: rgb(29, 28, 27);
font-family: 'Oracle Sans', Arial, sans-serif; } @media all and (min-width: 768px) { .component-styling-wrapper-108031 .job-details__description-content { line-height: 1.5 } }

Responsibilities

Key responsibilities

  1. Oversee and provide technical leadership to the developer managing all mechanical, electrical, and plumbing (MEP) construction activities for data center projects.
  2. Review and monitor the developer’s management of contractors and vendors, ensuring work complies with design specifications, quality standards, and safety requirements.
  3. Track and validate project schedules and milestones provided by the developer, highlighting risks and ensuring timely delivery of key objectives.
  4. Monitor MEP budgets through the developer, reviewing invoicing, change orders, and scope alignment for compliance and accuracy.
  5. Coordinate closely with internal teams to ensure the developer integrates MEP systems with broader project and business requirements.
  6. Conduct site visits and oversight audits to verify that the developer and general contractor maintain required quality, safety, and progress levels.
  7. Identify risks and propose mitigation strategies by proactively evaluating the developer’s plans and reporting concerns to leadership.
  8. Drive adoption of best practices and innovation by guiding the developer toward efficient and forward-thinking MEP solutions.
  9. Report on progress, challenges, and escalations to internal stakeholders and leadership, ensuring transparency and alignment.
  10. Ensure the developer maintains compliance with local regulations, building codes, safety requirements, and Oracle’s standards.
  11. Mentor junior staff and cross-functional partners on MEP oversight, promoting a collaborative and high-performance culture.
  12. Support commissioning, transition, and close-out activities by validating the developer’s handover processes for operational readiness.

Minimum qualifications

  • 3-5 years of experience delivering mission‑critical facilities (data centers, semiconductor, pharma, hospitals). Preference for data center construction experience.
  • Strong background in MV/HV/LV power systems, grounding/bonding, power quality, and protection coordination.
  • Hands-on experience with submittals/RFIs, FAT/SAT/IST, and energization events.
  • Working knowledge of NEC, NFPA 70/70E/110, IEEE; ability to review SKM/ETAP studies.
  • Proven interface with Developer/GC/A/E and electrical trades on large projects.

Preferred qualifications

  • CxA, PMP, or equivalent certifications.
  • Experience with major OEMs (switchgear, UPS, generators) and factory testing/witnessing.
  • Familiarity with DCIM/BMS integration (Modbus/BACnet/SNMP), and cybersecurity considerations for connected equipment.
  • Exposure to structured cabling/LV dependencies for device power and telemetry.

.component-styling-wrapper-108042 .job-details__description-header { color: rgb(29, 28, 27);
font-family: 'Oracle Sans Bold', Arial, sans-serif;
text-align: left; } @media all and (min-width: 768px) { .component-styling-wrapper-108042 .job-details__description-header { font-size: 20px; } }
.component-styling-wrapper-108042 .job-details__description-content { color: rgb(29, 28, 27);
font-family: 'Oracle Sans', Arial, sans-serif; } @media all and (min-width: 768px) { .component-styling-wrapper-108042 .job-details__description-content { line-height: 1.5 } }

Qualifications

Disclaimer:

Certain US customer or client-facing roles may be required to comply with applicable requirements, such as immunization and occupational health mandates.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $109,200 to $223,400 per annum. May be eligible for bonus and equity.

Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle's differing products, industries and lines of business.
Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Oracle US offers a comprehensive benefits package which includes the following:
1. Medical, dental, and vision insurance, including expert medical opinion
2. Short term disability and long term disability
3. Life insurance and AD&D
4. Supplemental life insurance (Employee/Spouse/Child)
5. Health care and dependent care Flexible Spending Accounts
6. Pre-tax commuter and parking benefits
7. 401(k) Savings and Investment Plan with company match
8. Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.
9. 11 paid holidays
10. Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.
11. Paid parental leave
12. Adoption assistance
13. Employee Stock Purchase Plan
14. Financial planning and group legal
15. Voluntary benefits including auto, homeowner and pet insurance

The role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted.

Career Level - IC4

.component-styling-wrapper-108029 .job-details__description-header { color: rgb(29, 28, 27);
font-family: 'Oracle Sans Bold', Arial, sans-serif;
font-size: 20px;
text-align: left; }
.component-styling-wrapper-108029 .job-details__skills-category { font-family: 'Oracle Sans', Arial, sans-serif; }
.component-styling-wrapper-108029 .job-details__skills-skill { color: rgb(29, 28, 27);
font-family: 'Oracle Sans', Arial, sans-serif; }
.component-styling-wrapper-108029 .job-details__skills-skill { border-color: rgb(62, 127, 124);
border-radius: 4px; }

Required Skills

  • Commissioning readiness and test execution support Familiarity with ITP/FAT/SAT/IST steps, witness testing (breaker trips, load banks, transfer sequences), and evidence capture for turnover.
  • Cross-discipline coordination and interface control Aligning electrical with mechanical/FLS/architectural and Oracle LV/DCIM/network requirements; maintaining ICDs and resolving clashes/sequencing.
  • Power systems fundamentals with practical field application MV/HV/LV distribution, grounding/bon

For more details click Job Post.

About Oracle

Oracle Corporation is a leading multinational technology company specializing in database software, cloud computing, and enterprise software.